• Questions? 403-257-8492
  • Operations Lethbridge, AB
  • Contact Us

Fire Station Consultant manitoba City News Consulting


Fire Station Consultant Manitoba

Previously the prevailing options for satellite stations, short-term, substitute or transitional station house has normally encompassed whatever from stressed fabric buildings, to converted single family residential properties. Chiefs, firemen, areas as well as managers are trying to find a more ideal means. Most agree – the EXTREME Fire Station is the solution.

Here's why:

  • As Secure as Site Built
  • Big Enough and Tough Enough for Full Size Apparatus Bays
  • Professional Fire Station Consulting
  • Estimated 50 Year Lifespan
  • Dramatically Reduced Construction Schedule
  • Fully Equipped, Industry Standard Crew Quarters & Operational Facilities with Premium Finishes
  • Steel Non-Combustible Construction
  • Streamlined Design and Procurement processes

Tags: news, departement, city, consulting, services, new, report, projects, management, recommends, safety, study, county, design, local, project, training, chief, hires, rescue, review, hall, story, articles.

Fire Station Consultant manitoba
Fire Station Consultant manitoba 02

The package includes support by EXTREME Fire Stations (EFS) in-house architectural design team, consultants and industry experts. Working in tandem with your fire department's operational experts, consultants and community leadership, EFS develops plans that consider all key aspects of station design.

EXTREME Fire Stations have been installed in rural, urban and industrial settings. Tell us about your expectations and we're confident we can offer a solution that meets the operational needs of the department, is installed in record time, appeals to the community and shaves substantial tax dollars from the budget.

We turn most preliminary design and budget cost inquiries around in a week or less.

We love to tour folks through our manufacturing facility and around our jobsites. The first thing we usually hear is "wow, I never realized how big it was" and then "this is really cool". Most EFS projects are designed and installed within a year of the project being initiated.

We're very proud of our technology and our team and would be delighted to arrange for you to visit our plant and / or an installation.

Fire Station Consultant manitoba 03
Fire Station Consultant manitoba 04
Fire Station Consultant manitoba 02
Fire Station Consultant manitoba 03
Fire Station Consultant manitoba 04
Fire Station Consultant manitoba 04

Service Locations

Fire Station Architect

Fire Station Design

Fire Station Consultant

Fire Station Floor Plans