• Questions? 403-257-8492
  • Operations Lethbridge, AB
  • Contact Us

Fire Station Consultant saskatchewan City News Consulting


Fire Station Consultant Saskatchewan

Previously the prevailing options for satellite stations, short-term, substitute or transitional station house has often featured whatever from stressed fabric structures, to converted single family members dwellings. Chiefs, firemen, districts and administrators are trying to find a more ideal means. Most concur – the EXTREME Fire Station is the solution.

Here's why:

  • As Secure as Site Built
  • Estimated 50 Year Lifespan
  • Steel Non-Combustible Construction
  • Fully Equipped, Industry Standard Crew Quarters & Operational Facilities with Premium Finishes
  • Big Enough and Tough Enough for Full Size Apparatus Bays
  • Dramatically Reduced Construction Schedule
  • Professional Fire Station Consulting
  • Streamlined Design and Procurement processes

Tags: news, departement, city, consulting, services, new, report, projects, management, recommends, safety, study, county, design, local, project, training, chief, hires, rescue, review, hall, story, articles.

Fire Station Consultant saskatchewan
Fire Station Consultant saskatchewan 02

The package includes support by EXTREME Fire Stations (EFS) in-house architectural design team, consultants and industry experts. Working in tandem with your fire department's operational experts, consultants and community leadership, EFS develops plans that consider all key aspects of station design.

EXTREME Fire Stations have been installed in rural, urban and industrial settings. Tell us about your expectations and we're confident we can offer a solution that meets the operational needs of the department, is installed in record time, appeals to the community and shaves substantial tax dollars from the budget.

We turn most preliminary design and budget cost inquiries around in a week or less.

We love to tour folks through our manufacturing facility and around our jobsites. The first thing we usually hear is "wow, I never realized how big it was" and then "this is really cool". Most EFS projects are designed and installed within a year of the project being initiated.

We're very proud of our technology and our team and would be delighted to arrange for you to visit our plant and / or an installation.

Fire Station Consultant saskatchewan 03
Fire Station Consultant saskatchewan 04
Fire Station Consultant saskatchewan 02
Fire Station Consultant saskatchewan 03
Fire Station Consultant saskatchewan 04
Fire Station Consultant saskatchewan 04

Service Locations

Fire Station Architect

Fire Station Design

Fire Station Consultant

Fire Station Floor Plans