• Questions? 403-257-8492
  • Operations Lethbridge, AB
  • Contact Us

Fire Station Floor Plans wyoming New Plan Design


Fire Station Floor Plans Wyoming

Until now the standard remedies for satellite fire stations, short-term, replacement or transitional station house has often consisted of whatever from stressed fabric structures, to restyled individual family residences. Chiefs, firefighters, neighborhoods and also managers are seeking a more effective method. Most agree – the EXTREME Fire Station is the solution.

Here's why:

  • Dramatically Reduced Construction Schedule
  • Steel Non-Combustible Construction
  • As Secure as Site Built
  • Fully Equipped, Industry Standard Crew Quarters & Operational Facilities with Premium Finishes
  • Streamlined Design and Procurement processes
  • Big Enough and Tough Enough for Full Size Apparatus Bays
  • Estimated 50 Year Lifespan
  • Detailed Fire Station Floor Plans

Tags: design, new, plan, city, news, view, rescue, files, building, uploads, project, central, renderings, buildings, departement, designs, engineering, house.

Fire Station Floor Plans wyoming
Fire Station Floor Plans wyoming 02

The package includes support by EXTREME Fire Stations (EFS) in-house architectural design team, consultants and industry experts. Working in tandem with your fire department's operational experts, consultants and community leadership, EFS develops plans that consider all key aspects of station design.

EXTREME Fire Stations have been installed in rural, urban and industrial settings. Tell us about your expectations and we're confident we can offer a solution that meets the operational needs of the department, is installed in record time, appeals to the community and shaves substantial tax dollars from the budget.

We turn most preliminary design and budget cost inquiries around in a week or less.

We love to tour folks through our manufacturing facility and around our jobsites. The first thing we usually hear is "wow, I never realized how big it was" and then "this is really cool". Most EFS projects are designed and installed within a year of the project being initiated.

We're very proud of our technology and our team and would be delighted to arrange for you to visit our plant and / or an installation.

Fire Station Floor Plans wyoming 03
Fire Station Floor Plans wyoming 04
Fire Station Floor Plans wyoming 02
Fire Station Floor Plans wyoming 03
Fire Station Floor Plans wyoming 04
Fire Station Floor Plans wyoming 04

Service Locations

Fire Station Architect

Fire Station Design

Fire Station Consultant

Fire Station Floor Plans