• Questions? 403-257-8492
  • Operations Lethbridge, AB
  • Contact Us

Fire Station Floor Plans north-dakota New Plan Design


Fire Station Floor Plans North Dakota

Until now the standard solutions for satellite fire stations, short-term, substitute or transitional fire stations has often been composed of whatever from stressed fabric structures, to modified solitary family homes. Chiefs, firefighters, cities as well as managers are trying to find a more effective way. Most agree – the EXTREME Fire Station is the solution.

Here's why:

  • Streamlined Design and Procurement processes
  • Steel Non-Combustible Construction
  • Estimated 50 Year Lifespan
  • Fully Equipped, Industry Standard Crew Quarters & Operational Facilities with Premium Finishes
  • Dramatically Reduced Construction Schedule
  • Detailed Fire Station Floor Plans
  • Big Enough and Tough Enough for Full Size Apparatus Bays
  • As Secure as Site Built

Tags: design, new, plan, city, news, view, rescue, files, building, uploads, project, central, renderings, buildings, departement, designs, engineering, house.

Fire Station Floor Plans north-dakota
Fire Station Floor Plans north-dakota 02

The package includes support by EXTREME Fire Stations (EFS) in-house architectural design team, consultants and industry experts. Working in tandem with your fire department's operational experts, consultants and community leadership, EFS develops plans that consider all key aspects of station design.

EXTREME Fire Stations have been installed in rural, urban and industrial settings. Tell us about your expectations and we're confident we can offer a solution that meets the operational needs of the department, is installed in record time, appeals to the community and shaves substantial tax dollars from the budget.

We turn most preliminary design and budget cost inquiries around in a week or less.

We love to tour folks through our manufacturing facility and around our jobsites. The first thing we usually hear is "wow, I never realized how big it was" and then "this is really cool". Most EFS projects are designed and installed within a year of the project being initiated.

We're very proud of our technology and our team and would be delighted to arrange for you to visit our plant and / or an installation.

Fire Station Floor Plans north-dakota 03
Fire Station Floor Plans north-dakota 04
Fire Station Floor Plans north-dakota 02
Fire Station Floor Plans north-dakota 03
Fire Station Floor Plans north-dakota 04
Fire Station Floor Plans north-dakota 04

Service Locations

Fire Station Architect

Fire Station Design

Fire Station Consultant

Fire Station Floor Plans